S.N.Scheme NameDistrictBlockFinancial Year
1Renovation of Lodhipur Ahar Pyne Irrigation SchemeARWALKaler2025-2026
2Renovation of Masadpur to Mathiya Ahar Pyne Sluice GateARWALKaler2025-2026
3Renovation of Salepur Ahar Pyne Irrigation SchemeARWALKurtha2025-2026
4Renovation of Dadhapa Ahar SchemeAURANGABADDeo2025-2026
5Renovation of Capra Pond SchemeAURANGABADGoh2025-2026
6Renovation of Shurypura Ahar Pyne SchemeAURANGABADNabinagar2025-2026
7Renovation of Manar Jalasay SchemeAURANGABADObra2025-2026
8Renovation of Laal BandhBANKABelhar2025-2026
9Renovation of Kelawari BandhBANKABelhar2025-2026
10Renovation of Kath Kola Jheel (Kaith Kola)BEGUSARAIBegusarai2025-2026
11Renovation of Panchrukhi Marda (Dandari-2) JalkarBEGUSARAIDandari2025-2026
12Renovation of Chauki Murdey Pokhar-03BEGUSARAISahebpur Kamal2025-2026
13Renovation of 33 (Baratiker), 65 (Ekyawan) 56 and 583 (Chawmukh and Tarcha) PyneBHAGALPURGoradih2025-2026
14Renovation of Morshiya Ahar PyneBHOJPURGarhani2025-2026
15Renovation of Karnaul Ahar PyneBHOJPURGarhani2025-2026
16Renovation of Ammanrvirpur and Narhi Ahar PyneBHOJPURKoilwar2025-2026
17Construction of Gated Weir on Bhaisaha RiverBUXARBuxar2025-2026
18Renovation of Barka Ahar Pyne Irrigation SchemeGAYAFatehpur2025-2026
19Renovation of Dadhpa Kanausi Pyne Irrigation SchemeGAYAGuraru2025-2026
20Renovation of Madheshari Pyne and Renovation of Nimiya Ahar PyneGAYAImamganj2025-2026
21Renovation of Gajipur Ahar PyneGAYAKonch2025-2026
22Renovation of Shinghra Ahar Pyne And PondGAYAKonch2025-2026
23Renovation of Earki PondGAYAMohanpur2025-2026
24Renovation of Choriya and Mahamadiya Ahar Irrigation SchemeGAYANeem Chak Bathani2025-2026
25Renovation of Kushahi Pyne (Narayanpur Weir)GAYATan Kuppa2025-2026
26Renovation of Makhdumpur Ahar Pyne Irrigation SchemeGAYATikari2025-2026
27Renovation of Chitokhar Ahar Pyne And PondGAYATikari2025-2026
28Renovation of Darua NalaGAYATikari2025-2026
29Renovation of Daulatpur Rupashpur Ahar Pyne Irrigation SchemeGAYATikari2025-2026
30Renovation of Kandaul Ahar Pyne Irrigation Scheme.JEHANABADHulasganj2025-2026
31Renovation of Khauna Ahar PyneJEHANABADHulasganj2025-2026
32Renovation of Surangapur Ahar Pyne Irrigation Scheme.JEHANABADJehanabad2025-2026
33Renovation of Bembai Mehi Ahar PyneJEHANABADKako2025-2026
34Renovation of Koriya Shekhpur Ahar PyneJEHANABADModanganj2025-2026
35Renovation of Sartain Pyne Irrigation Scheme.JEHANABADRatni Faridpur2025-2026
36Renovation of Kharaura PyneKAIMURChainpur2025-2026
37Renovation of Sheetalpur Check DamKAIMURChainpur2025-2026
38Renovation of 02 Dhobha PondKAIMURChand2025-2026
39Renovation of Harpur PondKAIMURDurgawati2025-2026
40Renovation of Barai Ghat JalkarKHAGARIAKhagaria2025-2026
41Renovation of Turka Singarpur Pyne, Renovation of Karbala Ramsheer Pyne, Renovation of Gulani Pyne Plot No.1332), Renovation of Chauniya Pyne and Renovation of Dakra Nala Phulwari PyneLAKHISARAIChanan*2025-2026
42Renovation of Sharma Bari PondLAKHISARAIRamgarh Chowk2025-2026
43Renovation of Chaudhar AharLAKHISARAISurajgarha2025-2026
44Renovation of Kushawa AharLAKHISARAISurajgarha2025-2026
45Construction of Rai Chanda Dam and Maththour Got Check Dam SchemeMADHUBANILaukaha2025-2026
46Construction of Karharwa Check Dam and Bargotar 04 Check Dam SchemeMADHUBANILaukahi2025-2026
47Renovation of Milkichak AharMUNGERDharhara2025-2026
48Renovation of Sonarwa Khajuriya BandhMUNGERKharagpur2025-2026
49Renovation of Gandhinagar to Khanpur PyneMUNGERTarapur2025-2026
50Renovation ofAuranga to Dhuriya Pyne, Renovation of Ranganw to Saraun (Jamuniya) Dar, Renovation of Lakhanpur to Phusana PyneMUNGERTarapur2025-2026
51Renovation of Chabilapur, Bhaidhpur, Ghosibari, Balichak, Nagwan Ahar Pyne SchemeNALANDABihar2025-2026
52Renovation of Akauna Ahar Pyne SchemeNALANDABihar2025-2026
53Renovation of Radhil PondNALANDAEkangarsarai2025-2026
54Renovation of Arjun Sarathua, Rashalpur Parmanandpur and Kharjamma Ahar Pyne SchemeNALANDAIslampur2025-2026
55Construction of Jalwar Rever per Weir Scheme in Gram SonawanNALANDAIslampur2025-2026
56Renovation of Meyar PondNALANDARajgir2025-2026
57Renovation of Kenar PondNALANDASarmera2025-2026
58Renovation of Surajpur Pushkarni PondNALANDASilao2025-2026
59Renovation of Bhawanpur Ahar Pyne Irrigation SchemeNAWADAGobindpur2025-2026
60Renovation of Sakra Ahar Pyne Irrigation SchemeNAWADAHisua2025-2026
61Renovation of Bhorambag to Kadhar Ahar Pyne Irrigation SchemeNAWADAKawakol2025-2026
62Renovation of Barail Ahar Pyne Irrigation SchemeNAWADANawada2025-2026
63Renovation of Gurmuha Pyne Irrigation SchemeNAWADANawada2025-2026
64Renovation of Chaumukhi to Dumri Badhor Pyne Irrigation SchemeNAWADARoh2025-2026
65Renovation of Dhiraudh Ahar PyneNAWADASirdala2025-2026
66Renovation of Banali Bigha Ahar PyneNAWADASirdala2025-2026
67Renovation of Beldha AharPyne Irrigation SchemeNAWADAWarisaliganj2025-2026
68Renovation of Barki and Chhotki Ahar in ChordargahSHEIKHPURAAriari2025-2026
69Renovation work of Kateshar Balagarh Ahar Pyne Irrigation Scheme.ARWALKarpi2024-2025
70Renovation work of Koni Manikpur Ahar Pyne Irrigation Scheme.ARWALKurtha2024-2025
71Construction work of Kona Check Dam, Kajla Check Dam and Naugarh Nala Check Dam.AURANGABADAurangabad2024-2025
72Restoration work of Wajidpur PyneAURANGABADAurangabad2024-2025
73Construction work of Nehuti Lapura Lift Irrigation SchemeAURANGABADAurangabad2024-2025
74Construction work of Sahaspur Lift Irrigation SchemeAURANGABADBarun2024-2025
75Construction work of Dhamani Lift Irrigation SchemeAURANGABADBarun2024-2025
76Construction work of spillway in Balikarna Nala.AURANGABADBarun2024-2025
77Renovation work of Misir Karma pond.AURANGABADBarun2024-2025
78Renovation work of Jinoriya AaharAURANGABADDaudnagar2024-2025
79Construction work of Tekari Check Dam, Khadiha Check Dam and Israur Check Dam.AURANGABADDeo2024-2025
80Renovation work of Dhibra Check Dam, Dumri Check Dam, Receiveup Pein and construction work of Check Dam and Turta Check Dam.AURANGABADDeo2024-2025
81Renovation work of Bhawanipur (284) PyneAURANGABADDeo2024-2025
82Renovation work of Ahari Aahar Pyne irrigation schemeAURANGABADDeo2024-2025
83Construction work of Anjaniya, Check Dam, Kantari Sargaon and Suhi Check Dam, Karma, Murarkhar and Tendui Check Dam and Durgi Check Dam.AURANGABADDeo2024-2025
84Renovation of Aranagar Check Dam, Khaira Pyne and construction work of Khaira Check Dam and Tetarin Check Dam.AURANGABADDeo2024-2025
85Construction of North Bela Lift Irrigation SchemeAURANGABADGoh2024-2025
86Construction work of Sonhathu Check dam.AURANGABADHaspura2024-2025
87Construction work of weir in Dihuri Nala.AURANGABADHaspura2024-2025
88Construction work of Matpa Check Dam and Pathra DamAURANGABADKutumba2024-2025
89Construction work of Labhari Khurd Check Dam, Karkata Check Dam and Pipra Baghi Check Dam.AURANGABADKutumba2024-2025
90Restoration work of Malahi PyneAURANGABADKutumba2024-2025
91Construction work of Chei Nawada Check Dam, Palkia Check Dam, Wordiha Check Dam, Irki Kala Check Dam and Ghatarain Check Dam.AURANGABADMadanpur2024-2025
92Restoration work of Pirwao Upperli dam Ahar PyneAURANGABADMadanpur2024-2025
93Construction Work of Chand Bigha Check DamAURANGABADMadanpur2024-2025
94Construction work of Hazari (Shivganj) Lift Irrigation SchemeAURANGABADNabinagar2024-2025
95Construction work of Hazari (Rajpur Sinwana) Lift Irrigation SchemeAURANGABADNabinagar2024-2025
96Construction work of Kajrain and Jhikatiya (2 nos) Lift Irrigation SchemeAURANGABADNabinagar2024-2025
97Renovation work of Badwan Pyne and construction work of check damAURANGABADNabinagar2024-2025
98Renovation work of Holichak check dam.AURANGABADObra2024-2025
99Restoration work of Murgiya Ahar and Tarawa AharAURANGABADRafiganj2024-2025
100Renovation work of Gothani, Banchar, Khurd, Kona Kanjpa PyneAURANGABADRafiganj2024-2025
101Renovation work of Kona to Kanjpa Pyne (234)AURANGABADRafiganj2024-2025
102Renovation work of Dahra Charo Bandh. (Plot No.-116,117,381,382)BANKAAmarpur2024-2025
103Renovation work of Bhikhanpur Bandh (Plot No.678)BANKAAmarpur2024-2025
104Renovation work of Dohri Bandh Scheme (Plot No. 33)BANKAAmarpur2024-2025
105Construction work of Athmaha Weir.BANKAAmarpur2024-2025
106Construction work of Lousa Lift Irrigation SchemeBANKAAmarpur2024-2025
107Construction work of Maldevchak Lift Irrigation SchemeBANKAAmarpur2024-2025
108Renovation work of Paraiya BandhBANKAAmarpur2024-2025
109Renovation work of Nagdha Bandh SchemeBANKAAmarpur2024-2025
110Renovation work of Mahto Pyne.BANKAAmarpur2024-2025
111Construction work of Parariya Weir Scheme, construction work of Kurumtar Check Dam and construction work of Tari Check Dam.BANKABanka2024-2025
112Construction work of Begpur check dam and construction work of Khushalpur check dam.BANKABarahat2024-2025
113Construction work of Kathoun Check Dam, construction work of Sahasram Dar Weir Scheme (Across Sukhniyan River) and construction work of Gokula Araji Weir Scheme (Siriya Bahiyar).BANKABausi2024-2025
114Construction work of Telangwa Check Dam, construction work of Phulhara Check Dam, construction work of Kadmajor Weir Scheme and construction work of Kerwar Nala Check Dam.BANKABausi2024-2025
115Construction work of Kauwadih check dam, construction work of Chilkara check dam on Sukhnia river, construction work of Chilkara check dam on Dumariya river and construction work of weir on Postmara riverBANKABausi2024-2025
116Construction work of Rampur Pabra Lift Irrigation SchemeBANKABausi2024-2025
117Renovation work of Jogikund BandhBANKABelhar2024-2025
118Construction work of Mathura Lift Irrigation SchemeBANKABelhar2024-2025
119Renovation work of Belatari Joginiya AharBANKABelhar2024-2025
120Renovation work of Salaiya Beharwa Ahar SchemeBANKABelhar2024-2025
121Renovation work of Giddha Pyne SchemeBANKABelhar2024-2025
122Renovation work of Pandar Bighwa Gigdartopa AharBANKABelhar2024-2025
123Construction work of Champatari Lift Irrigation SchemeBANKABelhar2024-2025
124Construction work of Chaura Lift Irrigation SchemeBANKABelhar2024-2025
125Renovation work of Ulhi Bandh.BANKAChanan2024-2025
126Renovation work of Budhwa Bandh SchemeBANKAChanan2024-2025
127Construction work of Domuhan Lift Irrigation SchemeBANKAChanan2024-2025
128Construction work of Dharhara Lift Irrigation SchemeBANKAChanan2024-2025
129Construction work of Pujhardih Lift Irrigation SchemeBANKAChanan2024-2025
130Renovation work of Bharthantari BandhBANKAChanan2024-2025
131Renovation work of Champa Pokhar.BANKAChanan2024-2025
132Renovation work of Reha and Footlahi Bandh SchemeBANKAChanan2024-2025
133Renovation work of Heth ChandanBANKAChanan2024-2025
134Construction work of Hiraraidih Lift Irrigation SchemeBANKAChanan2024-2025
135Construction work of Jugri Lift Irrigation SchemeBANKAChanan2024-2025
136Construction work of Pipradih Lift Irrigation SchemeBANKAChanan2024-2025
137Renovation work of Chandadih PyneBANKADhuraiya2024-2025
138Renovation work of Mukta Bandh, Muswa Pokhar Pyne and Pathalkudia to Chandpur PyneBANKADhuraiya2024-2025
139Construction work of Mathurapur Lift Irrigation SchemeBANKADhuraiya2024-2025
140Construction of Joki Weir on Gahira River and construction work of Gaurisagar Bandh Weir.BANKADhuraiya2024-2025
141Construction work of Patwa Weir Scheme and Construction work of Beli Gagh WeirBANKADhuraiya2024-2025
142Construction work of Datin Weir and construction work of Dharamgghara Weir Scheme.BANKADhuraiya2024-2025
143Construction of Deodar Weir and Balias Weir on Gahira River.BANKADhuraiya2024-2025
144Construction work of Jhunjhunia river check dam, construction work of Narayanpur check dam and construction work of Narkatiya weir.BANKAKatoria2024-2025
145Renovation work of Mishra Bandh (Akhilesh Mishra Talab) SchemeBANKAKatoria2024-2025
146Renovation work of Jogiya Bandh SchemeBANKAKatoria2024-2025
147Renovation work of Karjhousa BandhBANKAKatoria2024-2025
148Renovation work of Lawakarni BandhBANKAKatoria2024-2025
149Renovation work of Bangada BandhBANKAKatoria2024-2025
150Construction work of Kamdeodih Lift Irrigation SchemeBANKAKatoria2024-2025
151Construction work of Tulsibaran Lift Irrigation SchemeBANKAKatoria2024-2025
152Construction work of Domsarni-2 Lift irrigation schemeBANKAKatoria2024-2025
153Construction work of Kathoun Lift Irrigation SchemeBANKAKatoria2024-2025
154Construction Work of Domsarni-3 Lift IrrigationBANKAKatoria2024-2025
155Renovation work of Banda and Bhojrai BandhBANKAKatoria2024-2025
156Construction work of Hethnegajor Lift Irrigation SchemeBANKAKatoria2024-2025
157Construction work of Domsarni-1 Lift Irrigation SchemeBANKAKatoria2024-2025
158Construction work of Java Check DamBANKAPhulidumar2024-2025
159Construction work of Jharna Check DamBANKAPhulidumar2024-2025
160Renovation work of Narha bandh.BANKAPhulidumar2024-2025
161Renovation work of Muskabra and Bhangwa Nala Ahar SchemeBANKAPhulidumar2024-2025
162Renovation work of Kaitha Bandh (Plot No.-1007,1008,1026,1028)BANKAPhulidumar2024-2025
163Renovation work of Lapka Bandh (Plot No.-688,690)BANKAPhulidumar2024-2025
164Renovation work of Sajana Bandh Scheme. (Plot No.-466,467,468)BANKAPhulidumar2024-2025
165Renovation work of Bhagata Bandh (Plot No. 776)BANKAPhulidumar2024-2025
166Renovation work of Khasadhola Bandh (Plot No. 37,38)BANKAPhulidumar2024-2025
167Construction work of Lalmuniya Tari check dam, construction work of Sadpur weir scheme and construction work of Rampur weir.BANKAPhulidumar2024-2025
168Construction work of Ghusari Weir Scheme, construction work of Gokula Garikadasara Weir Scheme (Akras Sukhniyan River) and construction work of Tutakura Check Dam.BANKAPhulidumar2024-2025
169Renovation Work of Bhitiya BandhBANKAPhulidumar2024-2025
170Renovation work of Baburiya, Nichli and Uparly Bandh Scheme (Plot No. 283,328)BANKARajaun2024-2025
171Renovation work of Madhuban Pyne (Plot No.-15,21,48,160)(112)(53)(161,307)(379)(402)(286,310,338,353,212,296)BANKARajaun2024-2025
172Renovation work of Katiyama PyneBANKARajaun2024-2025
173Renovation work of Rampur Pyne (Plot No-190,268)BANKARajaun2024-2025
174Renovation work of Padampur Nabki Bandh and Padampur Raghuni Kitta Pyne (413,409,372,376,184,56,63)BANKARajaun2024-2025
175Renovation work of Bhagwanpur Pyne (Plot No.-512)BANKARajaun2024-2025
176Renovation work of Saura Lakra Bandh and Biddu Dauna (Chak Parasi) Pyne (Plot No.-400)BANKARajaun2024-2025
177Renovation work of Majhgain Pyne schemeBANKARajaun2024-2025
178Renovation work of Budhwa Bandh and Jhitka Pyne (Plot No. 32)BANKARajaun2024-2025
179Renovation work of Nara and Chakolia (24) PyneBANKARajaun2024-2025
180Construction work of Nijhri Lift Irrigation schemeBANKAShambhuganj2024-2025
181Construction work of Gidhaura Lift Irrigation SchemeBANKAShambhuganj2024-2025
182Construction work of Karsop Lift Irrigation SchemeBANKAShambhuganj2024-2025
183Renovation work of Mathurapur DamBHAGALPURColgong2024-2025
184Renovation work of Karikado DamBHAGALPURColgong2024-2025
185Maini Nala and Weir Construction work,Construction work of Lagma Check Dam on Kowa Nala,Construction work of Belkhoriya Weir on Andheri RiverBHAGALPURColgong2024-2025
186Construction work of Gauradih weir on Kadwa river, construction work of Bhojpur weir on Kadwa river, construction work of Habibpur weir, construction work of Dostani check dam on Kokra river, construcBHAGALPURGoradih2024-2025
187Construction work of Dariyachak check-Dam,Renovation work of Dostani Arazi weir,Construction work of Fazilpur weir,Construction work of Tarcha weir,Construction work of Agarpur Machhipur WeirBHAGALPURGoradih2024-2025
188Construction work of Shrirampur Dariyachak Check-Dam,Construction work of Mohanpur check-dam on Sonia River,Construction work of Paijamara Weir,Construction work of Bharokhar Weir on Karra RiverBHAGALPURGoradih2024-2025
189Construction work of Milky Weir,Construction work of Chaumukh weir,Construction work of Dhamna Milki Weir,Construction work of Sonudih WeirBHAGALPURGoradih2024-2025
190Constuction Work of Fatehpur Check DamBHAGALPURNathnagar2024-2025
191Renovation work of Basantpur DamBHAGALPURPirpainti2024-2025
192Renovation work of Gokul Mathura PyneBHAGALPURPirpainti2024-2025
193Construction work of Belthu Pyne & Weir,Construction work of Manikpur Khurd Weir,Construction work of Manikpur Buzurg weir,Construction work of Majrohi Weir and Pyne on Dhobiya DamBHAGALPURShahkund2024-2025
194Construction work of Hasanpur Weir on Patni Dam,Construction of Pariyak Check Dam and Pyne on Khoda Dam,Renovation work of Dobhi Rangnia check-Dam and PyneBHAGALPURSonhaula2024-2025
195Renovation work of Banokhar Dam AharBHAGALPURSonhaula2024-2025
196Construction work of Dhuaben lift irrigation schemeBHAGALPURSonhaula2024-2025
197Construction work of Rudrapur lift irrigation schemeBHAGALPURSonhaula2024-2025
198Construction work of Maheshpur lift irrigation schemeBHAGALPURSonhaula2024-2025
199Construction work of Shrimatpur weir,Construction work of Jadaha Weir,Construction work of Amdiha Check-Dam,Construction work of Pathakdih WeirBHAGALPURSonhaula2024-2025
200Construction work of Pansalla Karhariya Check-Dam,Construction work of Nisahara weir,Construction work of Kishanpur Weir on Chandan River,Construction work of Awa weirBHAGALPURSultanganj2024-2025
201Construction work of Khanpur Daulatpur Weir,Construction work of Katahra Enayatpur weir,Construction work of Ratanpur Check Dam on Gahira River,Construction work of Ratanpur Check-Dam on Bela River,CoBHAGALPURSultanganj2024-2025
202Renovation work of Baghi Aahar PyneBHOJPURAgiaon2024-2025
203Renovation work of Madanpur Aahar PyneBHOJPURAgiaon2024-2025
204Renovation work of Dhanauti Ahar.BHOJPURCharpokhari2024-2025
205Renovation work of Kothua Ahar and sluice gate.BHOJPURPiro2024-2025
206Renovation work of Lahthan Uttarpatti Ahar Jalasay Scheme.BHOJPURPiro2024-2025
207Construction work of Dihra check-Dam,Construction work of Dev check-Dam,Construction work of Laththan check damBHOJPURSandesh2024-2025
208Construction work of Sarna check-damBHOJPURShahpur2024-2025
209Renovation work of Tarari Ahar Pyne pond.BHOJPURTarari2024-2025
210Renovation work of Belaur Shivji Mandir Pond SchemeBHOJPURUdwant Nagar2024-2025
211Renovation work of Bhabhuar pond.BUXARBuxar2024-2025
212Construction work of Itadhi check damBUXARItarhi2024-2025
213Construction work of Atahi-2 Lift Irrigation SchemeDARBHANGABaheri2024-2025
214Construction of Chotki Daing Lift Irrigation SchemeDARBHANGABaheri2024-2025
215Construction of Harpur Kalan-02 Lift Irrigation SchemeDARBHANGABiraul2024-2025
216Construction work of Ramnagar Lift Irrigation SchemeDARBHANGABiraul2024-2025
217Ghusari Ahar (Plot No.-1212, 1204, 1283, 1011)GAYAAtri2024-2025
218Renovation work of Dighasin Dam Aahar Pyne irrigation schemeGAYABanke Bazar2024-2025
219Construction work of Azamgarh Weir (Morhar/Marawar River) and construction work of Nayaki Ahar (Garland Trache) (check dam).GAYABanke Bazar2024-2025
220Renovation work of Sebai Corridori Ahar Pyne irrigation schemeGAYABarachatti2024-2025
221Renovation of Mubarakpur Harigaon Ahar Pyne IrrigationGAYABelaganj2024-2025
222Renovation work of Mahabodhi Pyne Irrigation Scheme.GAYABodh Gaya2024-2025
223Renovation work of Suraj Bandh Ahar (Garland Trench)GAYADumaria2024-2025
224Renovation work of Check Dam and Lerua Ahar Irrigation Scheme on Bihdiya Nala, renovation work of Lakdahi Anjaniya Tand Ahar Pain Scheme (Check Dam), Construction work of Tanarwa Check Dam (Fatehi RivGAYADumaria2024-2025
225Restoration work of Kathautiya, Tarawa, Mayapur, Chaurahi, Suji Kala Aahar Pyne Irrigation Scheme.GAYADumaria2024-2025
226Renovation work of Piprahi Ahar irrigation schemeGAYADumaria2024-2025
227Construction work of check dam on Ghoddaha Nala, Construction work of Nonisot Nala Check Dam (Siervan River), Construction work of Simri Nala Check Dam, Renovation work of check dam on Belghat Nala, CGAYADumaria2024-2025
228Renovation work of Harihar Sagar, Imli Sagar AharGAYAFatehpur2024-2025
229Restoration work of Nava Verua Aahar Pyne Irrigation SchemeGAYAFatehpur2024-2025
230Renovation work of Kishun Sagar, Ram Sagar Aahar Irrigation SchemeGAYAFatehpur2024-2025
231Renovation work of Mataso Tezpur Ekamba Ahar PyneGAYAFatehpur2024-2025
232Restoration work of Mayapur, Jitani, Musatia, Pashiya and PyneGAYAFatehpur2024-2025
233Renovation work of Barkaul Pyne Bapugram irrigation schemeGAYAFatehpur2024-2025
234Renovation work of Pahadpur Tal, Jamheta, Hadhadwa Ahar PyneGAYAFatehpur2024-2025
235Renovation work of Khajuri and Dohapar pond, AharGAYAFatehpur2024-2025
236Amravati (Nala) Pyne Ahar Irrigation SchemeGAYAFatehpur2024-2025
237Renovation work of Pakdi Aahar PyneGAYAFatehpur2024-2025
238Restoration work of Bela Aahar (457)GAYAFatehpur2024-2025
239Renovation work of Ganga Sagar Ahar Pyne Irrigation SchemeGAYAFatehpur2024-2025
240Restoration work of Buchcha, Ghargoha AharGAYAFatehpur2024-2025
241Barikeel, Bahera, Khargal, Badhaun Neemi Ahar Pyne Irrigation SchemeGAYAFatehpur2024-2025
242Tal Ahar and Patiya Pokhar Irrigation SchemeGAYAFatehpur2024-2025
243Barhoria, Kanchanpur Ahar Pyne Irrigation SchemeGAYAFatehpur2024-2025
244Renovation work of Mitalal Ahar Pyne Irrigation SchemeGAYAFatehpur2024-2025
245Beria Chandan/1180 Ahar Pyne Irrigation SchemeGAYAFatehpur2024-2025
246Vishnu Sagar Ahar Pyne Irrigation SchemeGAYAFatehpur2024-2025
247Chhatu Dam Ahar Pyne Irrigation SchemeGAYAGaya Town C.D.Block2024-2025
248Aurvan Ahar (480) Irrigation SchemeGAYAGaya Town C.D.Block2024-2025
249Nima Ahar (2270) Irrigation Scheme Renovation WorkGAYAGaya Town C.D.Block2024-2025
250Ghutia Pokhar (475) and Paharpur Baguliya Ahar (55) irrigation scheme (Gaya Town C.D. Block)GAYAGaya Town C.D.Block2024-2025
251Renovation work of Bataspur Ahar Pyne Irrigation SchemeGAYAGaya Town C.D.Block2024-2025
252Renovation work of Niyazpur Aahar Irrigation SchemeGAYAGaya Town C.D.Block2024-2025
253Restoration work of Badki Ahar (1125) irrigation schemeGAYAGaya Town C.D.Block2024-2025
254Renovation work of Sherpur Pyne Irrigation SchemeGAYAGaya Town C.D.Block2024-2025
255Badki Ahar, Agarelikala Ahar-Pyne irrigation renovation workGAYAGaya Town C.D.Block2024-2025
256Renovation work of Pachu Bigha Pyne Irrigation SchemeGAYAGaya Town C.D.Block2024-2025
257Renovation work of Balan Ahar irrigation schemeGAYAGaya Town C.D.Block2024-2025
258Renovation work of Kusadih Ahar Pyne irrigation schemeGAYAGaya Town C.D.Block2024-2025
259Restoration work of Khiriyava Ahar (874)GAYAGaya Town C.D.Block2024-2025
260Restoration work of Badka Ahar, Panbharia Ahar and Panbharia- Mirahari Ahar irrigation schemeGAYAGurua2024-2025
261Renovation work of Ibrahimpur Pyne Irrigation SchemeGAYAGurua2024-2025
262Renovation work of Budhwa Budhi Parsa Pandey Ahar IrrigationGAYAGurua2024-2025
263Renovation work of Manguda Nala Irrigation Scheme (Check Dam) and Renovation work of Kothwara Pein (Dhawa Nala Weir) Scheme.GAYAGurua2024-2025
264Renovation work of Pathak Bigha Pyne (Hara Nala)GAYAGurua2024-2025
265Jagannathpur Pyne Irrigation SchemeGAYAGurua2024-2025
266Renovation work of Amirganj Chilore Manan Bigha Pain SchemeGAYAGurua2024-2025
267Renovation work of Badka AaharGAYAGurua2024-2025
268Renovation work of Benivigha, Dominia, Tarova Pyne Tikri, Badki Aahar irrigation scheme.GAYAGurua2024-2025
269Restoration work of Badka, Chhotka AharGAYAGurua2024-2025
270Restoration work of Guhiya Ahar IrrigationGAYAGurua2024-2025
271Restoration work of Sonar Bigha (Manda) PyneGAYAGurua2024-2025
272Renovation work of Babulia Ahar Irrigation SchemeGAYAGurua2024-2025
273Renovation work of Guneri pyne , Guneri Nariyahi, Mesuriya Ahar and Badaki Ahar Irrigation SchemeGAYAGurua2024-2025
274Construction work of Nagma Sluice Gate and Pyne Irrigation Scheme.GAYAImamganj2024-2025
275Construction Work of Bara Bandh (Labji River) Check Dam Irrigation SchemeGAYAImamganj2024-2025
276Renovation work of Koyli Aahar PyneGAYAImamganj2024-2025
277Renovation work of Khemna Aahar Pyne Irrigation SchemeGAYAImamganj2024-2025
278Renovation work of Pindra Garland TrenchGAYAImamganj2024-2025
279Construction work of Lavabar Weir Ahar PyneGAYAImamganj2024-2025
280Bihta Ahar Pyne Irrigation SchemeGAYAKhizirsarai2024-2025
281Renovation work of Khaira Digdhi Pyne Irrigation SchemeGAYAKonch2024-2025
282Renovation work of Bhauji Aahar (354)GAYAMohanpur2024-2025
283Restoration work of Kadarchuva Dam and Kakrautiya Ahar (1374, 1480 Gul Sakri Weir)GAYAMohanpur2024-2025
284Restoration work of Bandi Pipardaha Ahar Dam Irrigation SchemeGAYAMohanpur2024-2025
285Renovation work of Mayapur Ahar Bhaunwa AharGAYAMohanpur2024-2025
286Cheya Bahera Ahar Pyne Irrigation Scheme.GAYAMohanpur2024-2025
287Renovation work of Bichli Ahar (142, 141) Safa Pyne (172) schemeGAYAMohanpur2024-2025
288Bathani Ahar Pyne (1155) Irrigation SchemeGAYANeem Chak Bathani2024-2025
289Pokharna (85) Ahar Pyne Irrigation SchemeGAYATan Kuppa2024-2025
290Khajuraha Ahar Pyne (817) Irrigation SchemeGAYATan Kuppa2024-2025
291Restoration work of Jian Bigha and Matachak Ahar Pyne (1067,4521) irrigation schemeGAYATan Kuppa2024-2025
292Renovation work of Budha Ahar Pyne (2577) irrigation schemeGAYATan Kuppa2024-2025
293Restoration work of Nimiya Ahar irrigation schemeGAYATan Kuppa2024-2025
294Restoration work of Gulab, Shrirampur Ahar PyneGAYATan Kuppa2024-2025
295Renovation work of Barka Aahar Pyne Manjhauli SchemeGAYATan Kuppa2024-2025
296Renovation work of Simriya Tal Ahar PyneGAYATan Kuppa2024-2025
297Renovation work of Bada Sarkanda Aahar Irrigation SchemeGAYATan Kuppa2024-2025
298Restoration work of Salkhaniya Aahar-PyneGAYATan Kuppa2024-2025
299Restoration work of Parsova Aahar Pyne (468,557, 373)GAYATan Kuppa2024-2025
300Restoration work of Barka Ahar (378, 329) pond and pyneGAYATan Kuppa2024-2025
301Restoration work of Sabalchak (2173) Ahar Pyne PondGAYATan Kuppa2024-2025
302Renovation work of Nagahara Ahar (3169, 3170) and Purwari Ahar (240, 241, 245, 244)GAYATan Kuppa2024-2025
303Bilandpur Ahar (627), Bahuara (280 ) and Vela Ahar (238) renovation workGAYATan Kuppa2024-2025
304Restoration work of Baburahi (724) and Dullli (107) Ahar PyneGAYATan Kuppa2024-2025
305Renovation work of Guhiya, Pakahi and Gango Ahar Pyne irrigation schemeGAYATan Kuppa2024-2025
306Kalyanpur Pyne Irrigation Scheme.GAYATikari2024-2025
307Renovation work of Tothi Hanuman PondGAYAWazirganj2024-2025
308Restoration work of Dharaiya Aahar Pyne Irrigation SchemeGAYAWazirganj2024-2025
309Restoration work of Sudhani, Bhindas Bundi Ahar PyneGAYAWazirganj2024-2025
310Renovation work of Garaiya Aahar Pyne Irrigation Scheme (11,031,125)GAYAWazirganj2024-2025
311Tarahi Pond and Ahar Irrigation SchemeGAYAWazirganj2024-2025
312Construction work of Panro (Kedia) check dam, construction work of Phulwaria check dam and construction work of check dam in singhiya nadi mai checkdam .JAMUIBarhat2024-2025
313Construction work of Kelhua (Pachesari) check dam, construction work of Kelhua (Katka) check dam and construction work of Kelhua (Bakhari) check dam.JAMUIBarhat2024-2025
314Construction work of Chube Jor Check Dam, Construction work of Charpathala Jor Check Dam, Construction work of Nada Jor Check Dam, Construction work of Banpokhar Check Dam and Construction work of Karwata jor check damJAMUIChakai2024-2025
315Construction work of Bichhwa Jor (Madhopur) check dam, construction work of Dadhwa check dam, construction work of Basbutia Jor check dam, construction work of Dudhnia check dam, construction work ofJAMUIChakai2024-2025
316Construction work of Agra Jor Check Dam, Construction work of Pachim Jor Check Dam, Construction work of Barro Jor Check Dam, Construction work of Check Dam in Chihara River, Construction work of Bhalua Jor Check damJAMUIChakai2024-2025
317Renovation work of Chune AharJAMUIChakai2024-2025
318Renovation work of Ratan AharJAMUIChakai2024-2025
319Renovation work of Budhwa Ahar(chakai)JAMUIChakai2024-2025
320Construction work of Navagachi Check Dam, Construction work of Manikpur Check Dam, Construction work of Sanghra Jor Check Dam, Construction work of Ajay Jor Check Dam and Construction work of Bar Jor CheckdamJAMUIChakai2024-2025
321Renovation work of Hariandi AharJAMUIChakai2024-2025
322Renovation work of Baksa AharJAMUIChakai2024-2025
323Renovation of Simra Ahar SchemeJAMUIChakai2024-2025
324Renovation work of Jamua Ahar(Paranchi)JAMUIChakai2024-2025
325Renovation work of Kashi and Pandey AharJAMUIChakai2024-2025
326Renovation work of Devan AharJAMUIChakai2024-2025
327Renovation work of Khijurban AharJAMUIChakai2024-2025
328Renovation work of Barka Ahar (Nawada)JAMUIChakai2024-2025
329Renovation work of Bhawan AharJAMUIChakai2024-2025
330Renovation work of Budwatand AharJAMUIChakai2024-2025
331Renovation work of Bhattu AharJAMUIChakai2024-2025
332Renovation work of Dhangari AharJAMUIChakai2024-2025
333Renovation work of Jogmaran AharJAMUIChakai2024-2025
334Renovation work of BargadGachh AharJAMUIChakai2024-2025
335Renovation work of Narsiha AharJAMUIChakai2024-2025
336Renovation work of Manjhiya AharJAMUIChakai2024-2025
337Renovation work of Guhiya and Chamarwa AharJAMUIChakai2024-2025
338Renovation of Chahbachaa AharJAMUIChakai2024-2025
339Renovation work of Katra PokharJAMUIIslamnagar Aliganj2024-2025
340Renovation work of Chhotki Ahar Scheme (jamui)JAMUIJamui2024-2025
341Renovation work of Shimra Ahar (Plot No.-187)JAMUIJamui2024-2025
342Renovation work from Bairiya to Barhiya Ahar PyneJAMUIJamui2024-2025
343Renovation work of Teliya Ahar 374JAMUIJamui2024-2025
344Renovation work of Musan Ahar 372JAMUIJamui2024-2025
345Renovation work of Ghorahi Ahar (154)JAMUIJamui2024-2025
346Renovation work of Barahjata Ahar Bedhu Pokhar (1149,1238)JAMUIJamui2024-2025
347Renovation work of Badki Ahar Pyne Kushahi PokharJAMUIJamui2024-2025
348Renovation work of Tetaria Ahar (jamuai)JAMUIJamui2024-2025
349Renovation work of Badki Ahar Maniyadda SchemeJAMUIJamui2024-2025
350Renovation work of Pee Pokhar.JAMUIJamui2024-2025
351Renovation work of Kelhuwa (Pokhar) AharJAMUIKhaira2024-2025
352Renovation work of Laxman AharJAMUIKhaira2024-2025
353Renovation work of Bhadwadih (Gadhi) AharJAMUIKhaira2024-2025
354Renovation work of Parasi AharJAMUIKhaira2024-2025
355Renovation work of Kala AharJAMUILakshmipur2024-2025
356Renovation work of Rajbandh WeirJAMUILakshmipur2024-2025
357Renovation work of Kodiya AharJAMUISikandra2024-2025
358Renovation work of Pandey AharJAMUISikandra2024-2025
359Renovation work of Nowabha Ahar (89)JAMUISikandra2024-2025
360Renovation work of Berbari AharJAMUISono2024-2025
361Renovation work of Rajbandh (Plot No.-1899) AharJAMUISono2024-2025
362Renovation work of Mahui Pyne (Plot No.-372, 350,401)JAMUISono2024-2025
363Renovation work of Navai AharJAMUISono2024-2025
364Renovation work of Bara Vohiya AharJAMUISono2024-2025
365Renovation work of Goriyavathan AharJAMUISono2024-2025
366Renovation work of Teja Ahar 561JAMUISono2024-2025
367Renovation work of Bhalua Ahar 1859, 1898, 355JAMUISono2024-2025
368Renovation work of 224 Bariyarpur AharJAMUISono2024-2025
369Renovation work from Panna Singh Ahar to Sobhan Mian Khet (1572)JAMUISono2024-2025
370Renovation work of Inarwa Ahar (1171) AharJAMUISono2024-2025
371Renovation work of Nayaka Ahar 895JAMUISono2024-2025
372Renovation work of Bhaluahi Ahar 675, 681JAMUISono2024-2025
373Construction work of Sonradih check dam, construction work of check dam in Wurha/Goti river, construction work of Rajoun Ammaghat check dam and construction work of Kasoy check dam.JAMUISono2024-2025
374Construction work of Kala Ghoda Check Dam, Construction work of Baijadih Check Dam, Construction work of Jor Paniya Check Dam, Construction work of Batia Check Dam, Construction work of Haralwatand JoJAMUISono2024-2025
375Construction work of Jhanjhi river 1013 check dam, construction work of Jhanjhi 1519 check dam, construction work of Shivnama Jor (177) check dam, construction work of Carry Gobardaha check dam and coJAMUISono2024-2025
376Construction work of Reha Jor (1365,1245) Check Dam, Construction work of Shivmandir (1665) Check Dam, Construction work of Pasraha Jor Check Dam, Construction work of Belatand Jor Check Dam and ConstJAMUISono2024-2025
377Construction work of Bunbun (1283) Check Dam, Construction work of Jhajhi River 344 Check Dam, Construction work of Badki Tand Jor Check Dam, Construction work of Gamhariya Jor Check Dam, ConstructionJAMUISono2024-2025
378Construction work of Belabathan/Parmania check dam, construction work of check dam in Birhawa river, construction work of Ramsagar 2586 check dam, construction work of Surjana check dam and constructiJAMUISono2024-2025
379Construction work of Kova Jor 98 Check Dam, Construction work of Bhelwa Jor Check Dam, Construction work of Kakarhi Jor 483 Check Dam, Construction work of Gobardaha Jor Check Dam, Construction work of charkahi Jor check Dam Construction work of Jamuajor check DamJAMUISono2024-2025
380Renovation work of Sontar Pokhar (Plot-3629) Pyne Irrigation SchemeJEHANABADHulasganj2024-2025
381Karauta Ahar Pyne Irrigation SchemeJEHANABADJehanabad2024-2025
382Nonhi Gyanibigha Baghi Ahar Pyne Irrigation SchemeJEHANABADKako2024-2025
383Renovation work of Firoji Mathia Timbalpur Nigrain Pyne Irrigation Scheme.JEHANABADKako2024-2025
384Renovation work of Timbalpur Bangl Bichli Pyne (Ahar).JEHANABADKako2024-2025
385Renovation work of Murhara Sulice Gate Ahar Pyne Scheme.JEHANABADRatni Faridpur2024-2025
386Renovation work of Dumra Dam Check-Dam,Renovation work of Bhuarwa Nala Check-Dam,Renovation work of Panisoti Nala Check-Dam,Renovation work of Dariyawa Nala Check-Dam,Renovation work of Balua Check Dam,Renovation work of Kerwa Dohar Check Dam,Renovation work of Kushi Nala check dam,Renovation work of Khukhuman Check-Dam,Renovation work of Baksotia Check-Dam,Renovation work of Lohanwasot Check DamKAIMURAdhaura2024-2025
387Renovation work of Devkurwa Check-Dam, Sikradohar check Dam,Bhuarwa Dohar Check-Dam, Janua Check-Dam, Chaya Check-Dam,Sohnaita Dohar Check-Dam,Salayinar Check-Dam, Gohwanar Check-Dam, Suganwa SuganiyaKAIMURAdhaura2024-2025
388Renovation work of Kolhuwa Aahar Pyne (94, 377, 382, ​​464)KAIMURAdhaura2024-2025
389Renovation work of Vadar Pokhar Pyne (354, 329, 331)KAIMURBhabua2024-2025
390Restoration work of Piya Pokhar Pyne (100)KAIMURBhabua2024-2025
391Renovation work of Harla Aahar PyneKAIMURBhabua2024-2025
392Renovation work of Rehi NalaKAIMURBhabua2024-2025
393Renovation of Madanpura Aahar Pyne SchemeKAIMURBhabua2024-2025
394Renovation work of Belav NalaKAIMURBhabua2024-2025
395Renovation work of Saitha Pyne SchemeKAIMURBhabua2024-2025
396Renovation work of Chamaria Mukka Nala and Check-Dam,Renovation work of Budhwa Nala Check-Dam,Renovation of Phulkariya Nala check-dam Work,Renovation work of Dudhmaniya Nala Check Dam,Renovation work of Terhava Nala and check-dam,Renovation work of Basaheen Check-Dam,Renovation work of Vasahi check-dam,Renovation work of Patalkhoriya check-dam,Construction work of Majhaniya Nala and check-damKAIMURChainpur2024-2025
397Renovation work of Madanpura Ahar Pyne.KAIMURDurgawati2024-2025
398Renovation work of Chitto Pond.KAIMURRamgarh2024-2025
399Renovation work of Balua Betauna Jalkar.KATIHARBarari2024-2025
400Renovation Work of Mahhadipur PondKHAGARIAParbatta2024-2025
401Renovation work of Dubara jhil.KISHANGANJKochadhamin2024-2025
402Renovation work of Authli Plot No. 67 Nichali Plot No. 110 Ahar YojanaLAKHISARAIChanan*2024-2025
403Renovation work of Baburi Ahar PyneLAKHISARAIChanan*2024-2025
404Renovation work of Shivsona Ahar/PyneLAKHISARAIHalsi2024-2025
405Renovation work of Baghaur AharLAKHISARAIHalsi2024-2025
406Renovation work of Bhanpura Ahar/PyneLAKHISARAIHalsi2024-2025
407Construction work of Pipra check dam on Kaliyugwa river, Construction work of Noma check dam on Bhurha river, Construction work of Damodarpur check dam on Bahar river, Construction work of Morma check, On some river Construction work of Dogay check dam, On some river Construction work of Bakiya bad check dam on Some RiverLAKHISARAIHalsi2024-2025
408Renovation work of Satsanda Pyne (100)LAKHISARAIRamgarh Chowk2024-2025
409Renovation work of Gangtaiiya Pyne YojanaLAKHISARAISurajgarha2024-2025
410Renovation of Kusumaha Pyne WorkLAKHISARAISurajgarha2024-2025
411Construction work of Barhara Lift Irrigation SchemeMADHUBANIBabubarhi2024-2025
412Construction work of Sonamti Lift Irrigation SchemeMADHUBANIBabubarhi2024-2025
413Construction work of Kharagbani Lift Irrigation SchemeMADHUBANIBabubarhi2024-2025
414Construction work of Depura Check DamMADHUBANIBenipatti2024-2025
415Construction work of Gidhwash check dam and construction work of Salaha check dam.MADHUBANIBenipatti2024-2025
416Construction work of Ithar Check damMADHUBANIBisfi2024-2025
417Construction work of Kalikapur Lift Irrigation SchemeMADHUBANIKaluahi2024-2025
418Construction work of Sukki Lift Irrigation SchemeMADHUBANIKhajauli2024-2025
419Construction work of Chand Gebaraura Lift Irrigation SchemeMADHUBANIKhajauli2024-2025
420Construction work of Bhakua Lift Irrigation SchemeMADHUBANIKhajauli2024-2025
421Construction work of Dalokhar 01 Lift Irrigation SchemeMADHUBANILadania2024-2025
422Construction work of Dalokhar 02 Lift Irrigation SchemeMADHUBANILadania2024-2025
423Construction work of Atri Lift Irrigation SchemeMADHUBANILaukahi2024-2025
424Construction work of Dhanchhiya check dam and construction work of Chandrapatti check dam.MADHUBANILaukahi2024-2025
425Construction work of Sananpatti check dam and construction work of Brahmamottar (3) check dam.MADHUBANILaukahi2024-2025
426Construction work of Baruar-02 check dam and construction work of Bharfori check dam.MADHUBANILaukahi2024-2025
427Construction work of Dakahi check dam and construction work of Kauaha Pahari check dam.MADHUBANILaukahi2024-2025
428Construction work of Kalapatti check dam and construction work of Gehua Bairiya (Bala Bakhar) check dam.MADHUBANIPhulparas2024-2025
429Construction work of check dam on Ratanpur Barail-1, Barail-2 and Barail-3 in Ubhi river and construction work of check dam on Magnet (Mahane) river.MUNGERBariarpur2024-2025
430Construction work of Check Dam Mahane (Nahane) Pipesh Nala at Pipra, Construction work of Check Dam at Mahane (Nahane) Nala at Bhagalpura, Construction work of Mani river Check Dam (Karhariya East & WMUNGERBariarpur2024-2025
431Renovation work of Baghmara Pyne.MUNGERDharhara2024-2025
432Renovation work of Jamuniya AharMUNGERDharhara2024-2025
433Renovation Work of Murghat RiverMUNGERJamalpur2024-2025
434Renovation work of Hathiya Simanma Bandh.MUNGERKharagpur2024-2025
435Renovation work of Machhgaon Weir Bandh.MUNGERKharagpur2024-2025
436Renovation work of Dumardah Haud Jalashay.MUNGERKharagpur2024-2025
437Construction of Basmata check dam and renovation work of Pyne, Construction work of Gugalathi Check Dam, construction work of Kharra river check dam, and construction work of Mani river (Karhariya) ChMUNGERKharagpur2024-2025
438Construction work of weir in Virajpur on Mahane river.MUNGERSangrampur2024-2025
439Construction of check dam on Kathiya river and renovation work of Vishanpur Pain, construction of check dam at Lohra on Mahane river and renovation work of Pyne and construction work of Sakri river chMUNGERTetiha Bambor2024-2025
440Restoration work of Tetrawan PyneNALANDABihar2024-2025
441Renovation work of Dighi Tetranwa pond.NALANDABihar2024-2025
442Renovation work of Govindpur Barhog PyneNALANDABind2024-2025
443Renovation work of Kathrahi, Ishwarchak, Lalubigha Pyne.NALANDABind2024-2025
444Renovation work of Bargain Aahar Pyne Irrigation SchemeNALANDAGiriak2024-2025
445Extensive renovation work of Bangachha Telmar Pyne Scheme.NALANDAHarnaut2024-2025
446Renovation work of Diyawan Pond.NALANDAKarai Parsurai2024-2025
447Extensive Renovation work of Kachhiyama Pyne.NALANDANagar Nausa2024-2025
448Renovation work of Bhuthakhar, Chishtipur, Musahari, Parasdiha Pyne.NALANDANagar Nausa2024-2025
449Renovation work of Andhna, Shankarpur and Sardar Bigha Ahar Pyne.NALANDANoorsarai2024-2025
450Construction Work of Paaka Nala in Pyne from Noorsarai Sangat to Jajalpur Govt. School and Desilting of PondNALANDANoorsarai2024-2025
451Renovation work of Ratna PyneNALANDARajgir2024-2025
452Renovation work of Pachgaon Ahar PyneNAWADAAkbarpur2024-2025
453Renovation work of Motnaje Bahrain Ahar Pyne Irrigation Scheme.NAWADAHisua2024-2025
454Renovation work of Eknar Ahar Pyne Irrigation Scheme.NAWADAHisua2024-2025
455Renovation work of Derhgaon Pond Scheme.NAWADAKashi Chak2024-2025
456Renovation work of Sarauni Ahar PyneNAWADAKawakol2024-2025
457Renovation work of Chanwa Ahar se Marfa Ahar Pyne irrigation schemeNAWADAKawakol2024-2025
458Construction work of Nata River Paharpur Check Dam/WeirNAWADAKawakol2024-2025
459Construction work of Bandaili Spillway/Weir, Sarauni Pyne Check Dam and Weir Scheme on Nata River.NAWADAKawakol2024-2025
460Renovation work of Barat Main Pyne Raksha Pyne and Baidyanathpur Sinrasa Pyne SchemeNAWADAMeskaur2024-2025
461Renovation work of Badalpur Sakarpura SchemeNAWADANarhat2024-2025
462Renovation work of Ghagholi Jhikrua Pyne Irrigation SchemeNAWADANawada2024-2025
463Renovation work of Bargain Ahar Pyne Irrigation Scheme.NAWADANawada2024-2025
464Construction of Nea Weir (882)NAWADANawada2024-2025
465Construction work of Khuri Check Dam/WeirNAWADANawada2024-2025
466Renovation work of Gariba Madaini Ahar Pyne Scheme.NAWADARajauli2024-2025
467Renovation work of Pachambha pond.NAWADARoh2024-2025
468Renovation work of Rohain Pyne Irrigation SchemeNAWADARoh2024-2025
469Renovation work of Daini jhor Ahar Pyne Irrigation SchemeNAWADASirdala2024-2025
470Renovation work of Chowkiya Ahar Pyne Irrigation SchemeNAWADASirdala2024-2025
471Construction work of Pachgachia check dam, construction work of Mandiha Dulhania check dam and construction work of Teen Muhani check dam.PASHCHIM CHAMPARANGaunaha2024-2025
472Construction work of Olia Baba check dam/weir and Saharsava check dam.PASHCHIM CHAMPARANMainatanr2024-2025
473Construction work of Singhi Nala check dam, construction work of Nankar check dam and construction work of Surajpara check dam.PASHCHIM CHAMPARANRamnagar2024-2025
474Saidpur (691,763,363,313,215,209,90,43) Restoration work of PynePATNABarh2024-2025
475Restoration work of Jal Govind Pyne SchemePATNABarh2024-2025
476Hasan Chak Mukinpur (244,465,558,562,563) Restoration work of Pyne SchemePATNABarh2024-2025
477Renovation work of Kharbhaiya Pyne Scheme.PATNADaniawan2024-2025
478Construction work of check-dam on Dardha river in Jaitiya Panchayat, Construction work of Andauli Check-Dam (Bari Mohane) SchemePATNAFatwah2024-2025
479Renovation work of Bhedgaon Pyne SchemePATNAFatwah2024-2025
480Renovation work of Chuharmal Asthan Chaura Pyne scheme.PATNAKhusrupur2024-2025
481Renovation work of Chakia Chithaul Pyne Scheme.PATNAMasaurhi2024-2025
482Renovation work of Daulatpur Bhujaur Pyne Irrigation SchemePATNAMasaurhi2024-2025
483Renovation work of Lahshuna Pyne Scheme.PATNAMasaurhi2024-2025
484Construction of check dam and restoration work of Pyne in Morhar river of Ghorhua village.PATNAMasaurhi2024-2025
485Renovation work of Dhokahra Karauti Ahar Pyne Sluice Gate Scheme.PATNAPaliganj2024-2025
486Restoration work of Parasaw PynePATNAPandarak2024-2025
487Renovation work of Sahajadpur Pyne SchemePATNAPandarak2024-2025
488Renovation work of Panwar Pyne Scheme.PATNAPunpun2024-2025
489Renovation work of Lakhanpar Akauna Pyne Scheme (Harechak to Punpun via Siswa Chak)PATNAPunpun2024-2025
490Renovation Work of Mani Ahar (Jarlahi Mathiya)ROHTASBikramganj2024-2025
491Renovation work of Nadauan Pyne.ROHTASDinara2024-2025
492Renovation work of Tilokhar (Samardiha) pond.ROHTASNauhatta2024-2025
493Mishripur Aahar (361) scheme renovation workROHTASSasaram2024-2025
494Renovation work of Mahadaiya pond.SAMASTIPURSamastipur2024-2025
495Renovation work of Lagma pond.SAMASTIPURSinghia2024-2025
496Renovation work of Mubarakpur Lift Irrigation SchemeSARANManjhi2024-2025
497Renovation work of Jagdishpur PondSARANNagra2024-2025
498Renovation work of Tetarpur PondSARANNagra2024-2025
499Renovation work of Pyne from Bundi Falls to Gulab Ahar.SHEIKHPURAAriari2024-2025
500Renovation work of Rehra Pyne plot-392SHEIKHPURAAriari2024-2025
501Construction of check dam on Tati river near Ghatkusumbha, construction of check dam on Kodihari river near Bhadaus and construction of check dam on Tati river near Vrindavan Kusumbha.SHEIKHPURAGhat Kusumbha2024-2025
502Restoration work of Rajarani PokharBANKABausi2023-2024
503Restoration work of Akkatta (Akara) BandhBANKAShambhuganj2023-2024
504Construction of divisional and sub -divisional office buildingBEGUSARAIBegusarai2023-2024
505Renovation work of Bangali and Lulha Dam SchemeBHAGALPURGoradih2023-2024
506Renovation work of Daharpur Wear/Check Dam SchemeBHAGALPURGoradih2023-2024
507Renovation of Bandi Maniyara Ahar Pyne Irrigation Scheme.GAYANeem Chak Bathani2023-2024
508Renovation work of Nawka Ahar(Ghutwe)JAMUIChakai2023-2024
509Restoration work of Bhandra WeirJAMUIKhaira2023-2024
510Renovation work of Naiyadih AharJAMUISono2023-2024
511Renovation work of Laraua Ahar Pyne Irrigation Scheme.JEHANABADMakhdumpur2023-2024
512Restoration work of Sheetla JalkarKISHANGANJKochadhamin2023-2024
513Restoration work of Kathar Mani JhilKISHANGANJPothia2023-2024
514Restoration work of Pakribarwan Sudanpur Pyne Irrigation SchemeNAWADAPakribarawan2023-2024
515Restoration work of Velohari Badhar Sluice GatePATNADulhin Bazar2023-2024
516Renovation work of Ramgarhwa Paschim Lift Irrigation Scheme.PURBI CHAMPARANRamgarhwa2023-2024
517Restoration work of Sherpar pondSHEIKHPURABarbigha2023-2024
518Sahiyari Garland Trench SchemeAURANGABADMadanpur2022-2023
519Restoration work of Nasej Pokhar-1KAIMURKudra2022-2023
520Restoration work of Patkhavaliya PondKAIMURKudra2022-2023
521Construction of Office Building in NalandaNALANDABihar2022-2023
522Extensive restoration work of pond of Barsiyawan villageNALANDAEkangarsarai2022-2023
523Renovation of Shivpuri Jalashay SchemeNAWADAKawakol2022-2023
524Pramandaley kaaryaalay ka nirmaan kaaryaBANKABanka2021-2022
525Restoration of Eknar PondNAWADAHisua2021-2022
526Construction of Circle and Divisinal Building under Minor Irrigation Division CHHAPRASARANChapra2021-2022
527SIPAROOA AHARBHOJPURJagdishpur2019-2020
528AREEANV AHAR PYNEBUXARDumraon2019-2020
529VISHUNPUR AHAR PONDGAYABanke Bazar2019-2020
530AMATAREE PONDJAMUIKhaira2019-2020
531Ex Renovation of Pyarepur Ahar Pyne SchemeNALANDAGiriak2019-2020
532Ex Renovation of NEKAPUR, THAIRA, MAHUBALA, PILKHI, NEEMA AHAR PYNE AND PONDNALANDARajgir2019-2020
533chitaaha, phulavaar evan majhaariya udvavah sinchaee yeaajana ka jeerrnoeddhaar kaary.PURBI CHAMPARANBanjaria2019-2020
534patakholiya, basavariya evan shreepur udvavah sinchaee yojana ka jeernoddhaar kaary.PURBI CHAMPARANMotihari2019-2020
535sukoolapaakar, maalee evan shree khandee udvavah sinchee yojana ka jeernoddhaar kaary.PURBI CHAMPARANSugauli2019-2020
536SIKATEE AHAR-PYNEROHTASSanjhauli2019-2020